For contractors and home-service shops

Quote follow-up templates for HVAC, plumbing, and remodelers

The day 2, day 5, and day 10 schedule stays the same whether you work in HVAC, plumbing, or remodeling. What changes is the detail in the note: the job, the season when it applies, and the next step you offer. Change the placeholders and send the emails from your shop. If they reply at any point, stop the sequence and answer them.

Same schedule for every tradeDay 2, day 5, and day 10
Details that fit the jobThe system, the repair, or the project
A polite stopAfter day 10, unless they reply
How to use the templates

Change the placeholders, then send the notes from your shop.

These emails are yours to use. Send them from your shop by email. If they reply at any point, stop the sequence and answer them.

  1. Fill in the job details

    Change each placeholder so the note names the actual job, the address, and your shop. A specific note is easier to answer than a generic check-in.

  2. Send the emails from your shop

    Write from your own email, on the day 2, day 5, and day 10 schedule. If you already wrote once, don't start a new sequence. Send the next note.

  3. If they reply, stop and answer

    Once they write back, the sequence is done. Answer their question, and pick up the conversation from there.

  4. After day 10, stop unless the season changes

    After the last note, don't keep checking in. If the work is seasonal, you can write once more when the season changes, with a new note about timing.

HVAC

Mention the system, the visit, and the season when it is true.

Name the system you looked at, or the visit you made. If a season is actually coming, you can mention it. Don't use the weather to scare anyone into a yes. After day 10, you can write once more when the season changes.

Day 2 email

From[shop]
To[name]
SubjectChecking in on your [job] estimate

Hi [name],

Just making sure you got the estimate I sent on [date] for the [job] at [address]. I'm glad to answer questions about what we looked at during the visit.

Would later this week work for a quick call?

Thanks,
[your name]
[shop]

Day 5 email

From[shop]
To[name]
SubjectFollowing up on your [job] estimate

Hi [name],

I wanted to follow up on the estimate for the [job] at [address]. It covers [brief scope], and I can adjust it if anything has changed.

If you want this in place before [the first hot stretch / the first cold snap], I can look at dates with you. Would you like to schedule the work, or should I check back later?

Thanks,
[your name]
[shop]

Day 10 email

From[shop]
To[name]
SubjectI'll close out your [job] estimate for now

Hi [name],

I'll close out the estimate for the [job] on my end for now so I don't keep filling up your inbox.

If you decide to move forward later, just reply and I'll pick it back up.

Thanks,
[your name]
[shop]

Later seasonal email

From[shop]
To[name]
SubjectChecking back on the [job] estimate

Hi [name],

I closed out the estimate for the [job] earlier, and I wanted to check in now that [hot weather / cold weather] is coming. If you'd like to pick it back up, I can resend the quote or update it.

Would a quick call this week help?

Thanks,
[your name]
[shop]

Plumbing

Be clear about the job, whether it is planned work or a repair.

For a planned job, like a water heater replacement or plumbing for a remodel, later notes can ask whether the plan has changed. For a repair they already asked about, keep the note short and leave the next step easy. Be clear, not alarming. Don't hint at damage just to get a reply. The day 2 note can be the same for both. The day 5 note is where the job type matters most.

Day 2 email

From[shop]
To[name]
SubjectChecking in on your [job] estimate

Hi [name],

Just making sure you got the estimate I sent on [date] for the [job] at [address]. I'm glad to answer any questions.

Would later this week work for a quick call?

Thanks,
[your name]
[shop]

Day 5 email, planned work

From[shop]
To[name]
SubjectFollowing up on your [job] estimate

Hi [name],

I wanted to follow up on the estimate for the [job] at [address]. It covers [brief scope], and I can adjust it if the plan has changed.

Would you like to walk through the quote, or should I check back in a few weeks?

Thanks,
[your name]
[shop]

Day 5 email, a repair

From[shop]
To[name]
SubjectFollowing up on your [repair] estimate

Hi [name],

I wanted to follow up on the estimate for the [repair] at [address]. If you'd still like us to take care of it, I can look at dates that work for you.

Would you like to schedule the repair, or has this already been handled?

Thanks,
[your name]
[shop]

Day 10 email

From[shop]
To[name]
SubjectI'll close out your [job] estimate for now

Hi [name],

I'll close out the estimate for the [job] on my end for now so I don't keep filling up your inbox.

If you want to pick this back up later, just reply and I'll be glad to help.

Thanks,
[your name]
[shop]

Remodelers

These jobs often take longer to decide. Still send the day 2 check-in.

A remodel can mean they are comparing quotes or talking the plan over at home. The day 2 note still checks that they got the estimate. The later notes ask whether the scope has changed, and offer a simple next step, like a walk-through of the quote. Don't push for a hard close.

Day 2 email

From[shop]
To[name]
SubjectChecking in on your [project] estimate

Hi [name],

Just making sure you got the estimate I sent on [date] for the [project] at [address]. Take the time you need to look it over. I'm glad to answer questions or walk through any part of it.

Would later this week work if you want to go through the quote together?

Thanks,
[your name]
[shop]

Day 5 email

From[shop]
To[name]
SubjectFollowing up on your [project] estimate

Hi [name],

I wanted to follow up on the estimate for the [project] at [address]. If the scope has changed, or if you have questions about a line item, I can update the quote.

Would a walk-through of the estimate help, or should I check back in a few weeks?

Thanks,
[your name]
[shop]

Day 10 email

From[shop]
To[name]
SubjectI'll close out your [project] estimate for now

Hi [name],

I'll close out the estimate for the [project] on my end for now so I don't keep filling up your inbox.

If you decide to move forward later, or if the plan changes, just reply and I'll pick it back up.

Thanks,
[your name]
[shop]

What stays the same

The schedule is the same for every trade.

HVAC, plumbing, and remodel jobs all use the same days. The wording changes. The plan does not.

Day 2

Make sure they got the estimate, name the specific job, and ask one question they can answer in a line.

Day 5

Remind them what the quote covers, and make the next step easy. Offer two clear choices, not a long list.

Day 10

Send a last polite note, stay kind, and leave the door open. Then stop unless they reply.

FAQ

Common questions.

Can I use the same email for every trade?

The schedule is the same. Change the details: the job, the visit or the system, and the next step. A remodel note can offer a walk-through of the quote. An HVAC note can mention the season when that is actually true. Don't send a generic check-in to every job.

Should I wait longer on a remodel?

Use the same days as a starting point. Don't skip the day 2 check-in, even when the project is large. If you know they are still deciding or waiting on other bids, you can leave a little more time before the day 5 and day 10 notes. Don't let the quote sit for weeks with no close.

What if the work is seasonal?

Stay on the same day 2, day 5, and day 10 plan. Mention the season only when it is true, and don't use it to pressure them. After the day 10 note, you can write once more when the season changes, with a new note about timing.

Ambler Follow-Up does this for you by email.

Want this scored for you? Send last month's open quotes and we'll send a free report of which are still worth a follow-up. Use the form on this site, or email [email protected].